in Surakarta Indonesia  sales   price   shop   near me   near me shop   factory   supplier Weaving Machine 3 manufacturer   best   Cost   Custom   Cheap   wholesaler

our merchandise are selling well in the American, European, South American and Asian marketplaces. With a lot of years’ experience in these lines, we have been distinguished from other suppliers in China by our advantages in aggressive pricing, on-time shipping and delivery, prompt responses, on-hand engineering assist and very good following-sales solutions. More importantly, we make particular elements in accordance to equipped drawings/samples and warmly welcome OEM inquiries.

The EPT motor of PGF hi-pace knitting EPTT is applied with the method of frequency conversion, which allows the stepless pace manage even throughout the procedure, for instance: although the feeding breaks (finishes), the EPTT is instantly stopped while the vehicle feeding unit is used for knitting core fabirc, for both thick or skinny main material inside the restrict, the supply is uniform the EPTT is also stopped routinely although core breaking(finishing) to steer clear of degrated solution. And the braided cloth that is manufactured with PGF hello-speed knitting EPTT is of larger qualify and much more reputable.

II, Functions AND Materials OF KNITTING
PGF hello-pace knitting EPTT is able to knit curtain belt, shoe belt, cummerbund of the shapes of column, pipe, and flat, and pipe-condition jacket, and so on.
Various sorts of material are adoptable for PGF hi-speed knitting EPTT, such as cotton yarn, chemical fibre yarn, silk, delicate metallic wire, and so on.

III, Features
PGF hi-pace knitting EPTT is of the near construction, practical for operation, extremely computerized, fast for adjustment, reliable for procedure, of reduce sounds, of larger effectiveness, of EPT high quality and so on.

IV, Procedure Strategies
Ahead of starting the EPTT, shall verify the adhering to things:
1 regardless of whether the EPTT force is correct
2 whether or not the earth unit is trustworthy
three no matter whether the motor steering is appropriate
4 clean up the table, and other obstructions that affect the procedure of the EPTT
5 whether or not the EPTT oil is competent (oil product, oil volume)
After the previously mentioned things are checked and handed, comply with up the under processes to start off the EPTT:
1 hook up the EPTT (EPTT two section 380v)
2 go the change of EPT box to the stage of quotON quot(the EPTT source indicator is on, which signifies it is EPTTed)
3 press the start button
four switch the rotating-set up button clockwise
five refer to the handbook of frequency conversion EPTT to procedure the EPTT.

V, Treatment method FOR YARN-BREAEPT (FEPTSHING)
If the yarn breaks(finishes) whilst the EPTT is working, the breaking indicator is on. Check each and every yarn cop. If the yarn is broken, pull the conclude of that yarn towards the concluded knitting, and then push the startup button if the yarn cop is vacant, just take off that one particular, and change it and thread the yarn and pull the end of yarn toward the finished knitting, and then push the startup button. If the main is damaged, check the main unEPTTthe EPTT physique, and pull the conclude of the main toward the completed one particular, and then push the button to knit.

VI, ADJUSTMENT OF Bound Speed
To modify the velocity of the prime left EPT on the cEPTTr column can receive distinct velocity of bound, and various sheer-form cross details of every duration in mm (or named as merchandise density, product no.)

Refer to the under chart and desk one for information

DIAGRAM OF Gear

Contrast table among the certain pace of hello-velocity knitting EPTT and EPT EPTTble 1
(from the still left to the proper)
Frequency of motor: 60HzZB=30ZC=28
ZA speed of bound CM/min variety of sheer-shape cross position/CM

Frequency of motor: 60HzZB=30ZC=36
ZA speed of sure CM/min quantity of sheer-form cross stage/CM

Frequency of motor: 60HzZB=30ZC=38
ZA velocity of bound CM/min amount of sheer-shape cross position/CM

Observe: Although the frequency of motor is not 60HZ, the pace of certain is that the worth in the over table times the genuine function frequency/sixty, and the sheer-condition cross level is not changed.

VII, Maintenance INTRODUCTION
For the EPTT that is getting used, should lubricate its direct, spline ingot groove, and the lubrication quantity can not spill more than, and it is ideal to lubricate it just steering clear of dry-operating. Need to incorporate oil on the concave ring of spline shaft, at lEPT two moments per eigEPTT hours, many drops for every time.
The oil that is mainly used on the spline EPT box should be changed totally following 1 thirty day period, and then, is to be supplemEPTTd according to oil scale amount. During the manufacturing, decide regardless of whether to exchange lubrication (the lubrication utilized on the EPTT is 32#) according to the oil status. Shall thoroughly clean up the float on any areas usually (do not do it while the EPTT is managing).

VIII, Precautions for Set up and Assembly amp Unassembled
Installation: have to set the EPTT on the rigid ground, and need to hold it in level soon after whilst putting in the rear desk board.
Hanging Set up: if this EPTT is moved soon after dis-packaged, whether for forklift or crane, the level of toughness shall alwaEPTTbe set on the reduce crosspiece unEPTTthe holEPTTof the quadrate pipe EPTT, need to not on the table board of the knitting EPTT.

EPTTAL Component

Hello-velocity sealing knitting EPTT Operation manual Overall eleven pages
Web page six
seven.two normal faults and answer strategies for frequency conversion EPTT in underneath table

Fault display Fault material amp description Remedy techniques
E.O.C.A Overcurrent in acceleration one, examine whether or not the motor is shorted or partly shorted
two, extend the acceleration time
three, the configurations of frequency conversion EPTT is not rational, and EPT the capability of the frequency conversion EPTT
4, lessen the torque to improve the rated value.
E.OC.n Overcurrent in constant speed 1, verify whether the motor is shorted, no matter whether the output wire is insulated well
two, check out whether the motor is stopped to operate, whether or not the mechanical load waves
three, check out regardless of whether the capacity of the frequency conversion EPTT is way too tiny, and EPT the ability of the frequency conversion EPTT
four, check regardless of whether .the voltage of the EPTT network waves.
E.OC.d

E.OC.S

Overcurrent in deceleration
Overcurrent in stopping
one verify regardless of whether the wire insulation is properly, regardless of whether the motor is shorted
2 EPT the deceleration time
3 change by a frequency conversion EPTT of greater capacity
four the braking capacity of direct recent is way too big, and minimize the braking capacity of immediate existing
5 for the EPTT fault, ship again to the factory for restore.
E.GF.S
E. GF.a
E. GF.n
E. GF.d
Shortcut to ground one check whether or not the wire of motor is shorted
2 increase the EPTT network, and examine regardless of whether there is the wave of voltage
3 ship again for fix
E.ou.S

E.OU.a

E.OU.n

E.OU.d

Overcurrent in acceleration
Overcurrent in deceleration
Overcurrent in continual velocity
Overcurrent in deceleration
1 prolong the deceleration time, or incorporate with the brake resistor
2 boost the EPTT community, and check out no matter whether there is the wave of voltage.
E.Fb.S
E. Fb.a
E. Fb.n
E. Fb.d
Fuse melted

If fuse melted, send out again for fix
E.Lu.s
E. Lu.A
E. Lu.n
E. Lu.d
Minimal voltage 1 verify whether the voltage is typical
two verify whether the load waves
3 check no matter whether the period is lacked.
E.OH.S
E. OH.A
E. OH.n
E. OH.d
Overheat of frequency
conversion EPTT
one examine regardless of whether the enthusiast is stopped to operate, whether or not the radiating piece is lined by imEPT
two check out regardless of whether the surroundings temperature is normal
three examine whether or not the airing space is ample, no matter whether the air is convective
E. OL.A
E. OL.n
E. OL.d
Overload of frequency
conversion EPTT
150% for each minute
one verify whether or not the frequency conversion EPTT is of smaller sized capability, whether or not is coated by imEPT
two examine no matter whether the load of the EPTT is blocked
3 V/F curve is not set properly, and shall be reset.

Hello-speed sealing knitting EPTT Operation handbook Whole 11 webpages
Page seven
continued

E.OA.A
E.OA.n
E.OA.d
EPT overload 150% for every one particular minute one examine whether the mechanical load moves
2 the motor distribution is too modest
3 the motor is overheated, and the insulation gets to be worse
4 check no matter whether the voltage moves significantly
five check out whether or not the section is lacked
6 the mechanical load is EPTd.
E.OT.A
E.OT.n
E.OT.d
Above-torque of motor one examine no matter whether the mechanical load moves
2 verify whether the motor configuration is too tiny.
E.bs.A
E. bs.n
E. bs.d
E. bs.s
The electromagnetic contactor assistant coil does not suggestions. Send out back for repair
E.bT.A
E. bT.n
E. bT.d
The brake transistor is broken. Make contact with with the manufacturing unit.
E.EC.S
E. EC.n
E. EC.d
E.EC.A
CPU fault Make contact with with the factory.
E.EE.S
E. EE.n
E. EE.d
E.EE.A
E Promenade fault Make contact with with the manufacturing unit.
ER Exterior interference Insulation with the interference source
ES Emergency parking UnEPTTthe crisis position
twenty four-20mA broken circuit EPT with the previously mentioned broken one particular
Pr Miscalculation of specification set up Correct specification of set up
DCb Brake status of immediate present UnEPTTthe brake standing of direct current

Hi-velocity sealing knitting EPTT Procedure guide Complete eleven internet pages
Web page 8
VIII, Crucial operate, purpose show, operation introduction of HLPC 0D7523A EPTT procedure EPTT
eight.1 key perform of HLPC 0D7523A EPTT operation EPTT

1 PROG programming/purpose screen essential
two EPTTR/DISP key of information affirmation, following the information is amended, press this essential to verify the entry of data
three up/down keys, choose specification, amend info and so on.
4 Operate demand from customers crucial of procedure, start procedure
five Stop/RESET cease/ reset key, quit procedure, and the procedure is disturbed, and reset
six FREQ Established frequency set up button, can set up this button in orEPTTto enter the main frequency.

Hello-velocity sealing knitting EPTT Procedure guide Complete eleven webpages
Web page 9
eight.two Clarification of function exhibit items

  1. T fifty. frequency rate 50. HZ
  2. F fifty. rated frequency fifty. HZ
  3. R 02. output of existing 2.0A
  4. U220 output of voltage 220V
  5. U540 immediate voltage 540V
  6. r 39. temperature 39 ordmC
  7. .001 counter
  8. L50. PID suggestions is fifty%
  9. 000. working speed
  10. Fo r good operating
  11. r EU adverse managing

Hi-velocity sealing knitting EPTT Operation manual Complete 11 webpages
Website page 10
eight.3 Explanation of keyboard

EPTT on #8594 screen F00.(press PROG) #8594display FOR or REV (press PROG) #8594 existing C000 (the perform code assortment interface can make use of #9661 #9651keEPTTto adjust the flash digit variety, the last digit flashes) #8594 (push EPTTR) existing C000 (The very first digit flashes) #8594 (push EPTTR) existing C000 (The 1st digit flashes) #8594 (push EPTTR) current C000, the final digit flashes.

Case in point: c111 is set as two, as adhering to
EPTT on #8594 screen F00. #8594 FOR #8594C000 (the final digit flashes) #8594C001 (the final digit is changed into one, and flashes) push EPTTR #8594C001 (The center digit flashes) push #9651 #8594C011 (the middle digit is changed into one, and flashes) push EPTTR #8594C011 (The very first digit flashes) push #9651 #8594C111 (the initial digit is changed into one, and flashes) push EPTTR EPTT #8594present (push #9651) #8594present 2 (existing EPTTr EPTT, and it is ok) #8594C112

Hi-pace sealing knitting EPTT Operation guide Whole 11 web pages
Webpage eleven
VIII, EPT Diagram (see attachment)

VV, Thorough EXPLAINATION OF FREQUENCY CONVERSION EPTT

I. EPTT Introduction
The large-pace braiding EPTT utilizes a variety of EPTT and novel design. 4 16-spindle braiding EPTTs are integrated into 1 unity. By employing the VFD-A sort alternating existing motor EPTr that is developed by way of combining the personal computer handle EPT, the centralized frequency-adjust and stepless pace regulation can be recognized. The EPTT is provided with numerous varieties of computerized protecting functions this kind of as: automatic end while the line breaks, more than torque, more than voltage, unEPTTvoltage, overheating, in excess of load and so on. The EPTT also has numerous outstXiHu (West EPT) Dis.Hu (West EPT) Dis. positive aspects, for case in point: higher rotate pace, substantial creation performance, modest ground region, lower sounds, EPTT service daily life and simple procedure as effectively as strength conserving. It is the upgrading and new era product of conventional disc braiding EPTT.
II. Simple EPTnical Parameters
Rated EPTT of motor: 075W
Rated speed of motor: 1390r/min
Variety of spindle: 16*4 960*790*seven hundred(L*B*H)
24*2 1240*620*seven hundred(L*B*H)
Specification of quill:( Phi48*one hundred sixty)mm
Spindle velocity: 350r/min
Method of pace adjustment: frequency-alter and stepless velocity regulation
III. Provider Conditions
Voltage of EPTT provide: AC220V plusmn10%HUO or AC380V plusmn10%
Frequency of EPTT offer: 50HZ plusmn5%
Ambient temperature: -ten ordmC-forty ordmC(no condensation and no freeze)
Ambient humidity: unEPTT90%RH(no condensation)
Running environment: no water droplets, steam, dust and grease stain
no putridity, flammable fuel and liquid
no drifting dust and metal particle
solid foundation, no critical vibration
no interruption of electromagnetic sounds.
IV. Installation
4.1The equipment fixture base are not required for the set up of this EPTT. Only area the EPTT on the sound and even concrete ground and maintain amount with out vibration.
four.two Configuration of EPTT EPT
four.2.one In accordance to the customer demand from customers, the EPTT may supply high speed braiding EPTTs that are used to two types of voltage ranges: 220V, 50HZ and 380V, 50HZ. The user shall link strains correctly in accordance to the appropriate voltage level of acquired gear. Be certain no improper relationship so as to avoid that the EPTT can not operate generally or any harm happens.
four.two.two When consumer disposes the EPTT offer of higher pace braiding EPTT, please EPTTly treatment no matter whether there is a reliable floor line in the electrical energy grid (SV220VAC380V)technique (i.e. Whether there is reliable grounding for socket grounded phase of EPTT source AC220V or AV380V). If not, an added protecting ground line for the EPTT ought to be created. Its foundation resistance shall not be in excess of 4 Omega. And then merge it into the grounded stage of EPTT socket (SV220V or AC380V) or inducted to the grounding stop of the EPTT straight.

4.2.3 The EPTT line connection of the EPTT is previously completed for users. The grounded stage of EPTT offer plug is rightly connected with grounding finish of the EPTT. The user just wants to insert the EPTT provide plug into the EPTT offer socket that is well prepared according to related voltage amount to connect the existing.
four.three In the circumstance of not connecting the present, open the doorway of EPT management box with the supplied essential to check out whether or not electric powered factors in EPT management box are ruined or loosening. If the connecting line is loosening, related measures should be done in time.
5.1 No-load Take a look at
five.one.1 Swap on the EPTT source of EPT control box
5.1.2 Switch on the swap of EPTT source within the EPT manage box. If the indicating lamp of EPTT supply on the management panel and pertinent indicating lamp on EPTT operator panel of frequency changer illuminate, it is indicated that almost everything is rigEPTT and no-load check can be operated.
5.1.3 Turn the speed-regulating potentiometer of frequency placing knob on the EPT management box panel back again to the scale 50(anti-clockwise rotation). Instantaneously push the button to make the EPTT to rotate instantaneously and look at whether or not it is rotating clockwise or not. If not, trade the positions of U and V of output port of frequency changer. Look at and make certain that the all operating is fleXiHu (West EPT) Dis.ble and easy to make sure no obstacles and irregular clash. If anything mistaken happens, appropriate motives ought to be identified in orEPTTto resolve the problem.
five.1.four Push the startup button on manage panel, then progressively raise the controlling stress of alternating motor EPTr (i.e. gradually rotate the potentiometer knob clockwise) at the exact same time, look at and guarantee that the speeds of motor and rotation board are escalating progressively and that the working is standard.
5.one.5 Push the stop button on manage panel and observe whether the motor is synchronized with the instruction. If not, the reason shall be discovered in orEPTTto eliminate the fault.
5.two Load Check
5.2.1 After no-load take a look at is finished, the load examination can be operated. Place the braiding spindle into the desktop XiHu (West EPT) Dis.Hu (West EPT) Dis.. Equip the braiding spindle with the necessary specified quill with the essential shade yarn in accordance to the extravagant yarns that will be weaved and get everything prepared.
five.2.2 Switch the pace-regulating potentiometer knob on the EPT control box panel back to the scale , instantaneously push the button to switch on motor and make it rotate. View that the working of quill has impediment or clash. If one thing incorrect happens, the reason shall be located in orEPTTto eliminate the fault.
five.two.3 Press the startup button and flip the speed-regulating potentiometer knob. Make the motor to maintain working for a even though(five~10min)in the velocity of 1000r/min. If every thing is proper, lower off one yarn by guide. If the motor is turned off at after, it is proved that automatic cease protecting device is sensitive. So, the EPTT examination is concluded entirely. The EPTT can be set into the normal generation.
VI. Specific Notices
In orEPTTto make sure the securities of individuals and gear and get the greatest provider result, we would like to particularly rXiHu (West EPT) Dis.Hu (West EPT) Dis.d all of end users that adhering to instances need to be paid out more attentions even though putting in this EPTT.

six.1 The workshop with the installation of this EPTT must have very good ground wire with ground resistance of much less than four

6.two This EPTT need to be grounded independently it shall not be jointly grounded with higher electric-existing EPTTs, this sort of as electrical welding EPTT and large-EPTT electric powered motor. The EPTal location of floor line must be equal or far more than 4mmtwo.
six.three Before this EPTT is still left from the producing factory, for 108 parameters of frequency changer, subsequent eighteen parameters (see desk 1) require to reset according to demands of the EPTT technical overall performance, and the other 130 parameters are all kept as what they are established at producing manufacturing unit. If there is no EPTT need, customers make sure you do not randomly adjust frequency changer parameters any more.

Perform code Function Placing scope and function clarification Established benefit
C001 Accelerating time environment .1~6500S four
C006 Intermediate voltage placing .1~255/510 thirteen
C007 Intermediate frequency placing .01~600 two.5
C571 Max. frequency setting 50.~600. fifty
C012 Working manage placing ~2 1
C013 Running frequency option ~2 one
C015 Halting way option ~1 1
C016 Reverse turning option ~one one
C571 Startup frequency placing .1~10 five
C571 Inching frequency placing ~600 20
C033 Accelerating time placing .1~6500S three
C050 Multi-functional input stop FOR one
C051 Multi-functional input finish REV 4
C053 Multi-purposeful input finish SPH seven
C075 Analog amount EPT placing .~600 50
C088 EPT rated rotate speed ~9999 270
C100 EPTT torque compensation .~ten. five

6.4 When frequency changer outputting, in output side main circuit, alternating existing contacting place is not allowed providing and breaking EPTT supply.
6.5 When the temperature in workshop surpasses forty ordmC, forced air cooling measure need to be adopted to EPT manage box.
6.six When above torque or other faults occur, ahead of the cause is distinct and faults are solved, frequency changer are not able to be started once again in orEPTTto steer clear of bringing injury to the EPTT. The method of restarting frequency changer is: one. To start with press the RESET button on frequency changer EPTT operator panel and then press the quit button on major controlling EPT box procedure panel and lastly press the startup button two. Change off the EPTT supply in major managing EPT box and switch on yet again, and then press the startup button.
six.7 When the change of EPTT supply in EPT handle box is turned off and just before indicating lamp on frequency changer EPTT operator panel goes out, any element of circuit inside EPT control box cannot be touched or any assembly and disassembly and wiring can’t be completed.
6.eight After braiding spindle is mounted in the quill, reverse turning is not allowed any more in this EPTT.
six.9 Max. working rotate speed of this EPTT is designed as 350r/min, but really economical rotate speed is about 300r/min. Prior to this EPTT leaves manufacturing manufacturing facility, its max. doing work rotate velocity is set to be limited inside economical rotate speed scope. Buyers please do not randomly modify corresponding parameters any more to enhance the velocity. In this way, EPTT accident can be averted.
6.10 This EPTT can’t operate EPTT time (considerably less than 30min) at reduced speed of much less than 100r/min, or else electric motor will be ruined because of to overheating.
six.eleven It is unfavorable for this EPTT to be commenced and stopped at low or substantial rotate speed (when the EPTT is commenced, if rotate pace is way too lower, beginning torque is minimal and this EPTT is hard to be began up but if rotate speed is too substantial, commencing recent is way too large and frequency changer is easily overloaded. When the EPTT is stopped, if rotate velocity is too higher, frequency changer is easily to be in excess of voltage. When the EPTT is commenced up, remember to to begin with flip the knob of pace-regulating potentiometer on EPT handle box procedure panel to the scale fifty (about 100r/min) and then press the startup button. When the EPTT is stopped, remember to flip the knob of velocity-regulating potentiometer back again to the scale 50 and then press the stop button.
six.twelve Strain-evidence take a look at of spare areas inside frequency changer is forbidden.
6.13 The key of EPT manage box of this EPTT is kept by its operator. And non-operator can not work major controlling EPT box.
six.fourteen The electrical element of this EPTT need to be maintained and repaired by experienced and specialist EPT experts.
7.Typical faults and remedies
seven.one Typical faults and solutions of EPT management circuit can be witnessed in desk 2.

EPT-velocity Braiding EPTT Instruction Total webpages
No. Website page
No. Fault Fault cause and solution
one Switch on EPTT provide 1.1 Indicating lamp does not mild line stop looses or fuse breaks
2 Inching button 2.one Electrical motor are not able to run instantaneously
two.1.1 Inadequate make contact with of the button
two.1.2 Error of parameter environment
2.one.3 Fault of frequency changer
two.1.4 Poor get in touch with of electric motor link or fault of electric powered motor
2.one.five Road blocks at operating element of the mechanism
three Push the startup button
four Press the stop button
5 EPTT end are not able to look when the line breaks 5.1.1 Fault or damage of digital circuit
five.twelve Mini-relay
5.one.three Fault of EPTT transformer
5.1.four Damage or bad contact of line-split mini-relay

  in Surakarta Indonesia  sales   price   shop   near me   near me shop   factory   supplier Weaving Machine 3 manufacturer   best   Cost   Custom   Cheap   wholesaler

  in Surakarta Indonesia  sales   price   shop   near me   near me shop   factory   supplier Weaving Machine 3 manufacturer   best   Cost   Custom   Cheap   wholesaler