
Owing to our broad solution selection and abundant ordeals in this industry, Our major products are Needle Roller bearings, Cylindrical Roller Bearings, Rod conclude Bearings, Spherical plain bearings, Keep track of roller Bearings for Guideway, Roller Bearings, Merge Bearings for forklifts, Drinking water Pump Bearings, SNR Car Bearings and all sorts of Spherical Bearings. we offer you one particular-stop answer for the purchase of mechanical power transmission products in China. I. Full automated welding line ( EPTTry listing)
| one | EPTT trimming amp poEPTTng EPTT |
| two | EPTT hole punching EPTT |
| 3 | EPTT joggling EPTT |
| four | Autoamtic socket welding EPTT |
| 5 | EPTT manage welding EPTT |
| 6 | EPTT base base welding EPTT |
| seven | EPTTg welding EPTT |
| 8 | EPTT EPTTitudinal seam welding EPTT |
| 9 | Are plate chopping amp poEPTTng EPTT |
| ten | EPTT head assembly and tag welding |
| 11 | EPTT head circumferential seam welding EPTT |
EPTT head circumferential seam welding EPTT:
EPTT EPTTitudinal seam welding EPTT
Take care of/Bottom foundation welding line
II. EPTnical parameter:
A. EPTT trimming amp poEPTTng EPTT
This EPTT is utilized for upper/decrease cap trimming, edge welding element outer poEPTTng. The primary shaft motor is 5.5KW, the poEPTTng motor is 1.5KW.
The EPTT utilizes four column EPT presser structure, PLC control, loading/unloading by mechanical arm, the cEPTTr mould rotation is EPTn by motor and EPT situation, the include is EPTn by the leading oil cylinEPTTto locate and push the workpiece, EPT system EPTs outer blade feeding, the outer blade follows by the inner blade dish on the main shaft and cap workpiece to rotate and slicing. Facet has a poEPTTng EPTT, the poEPTTng dish will EPTTr to eliminate the dust on the upper cap welding region, then rotation trimming and poEPTTng total at the exact same time. The outer blade and poEPTTng dish reset, the primary oil cylinEPTTEPTn sliEPTTreset, and the assistance plaaet will increase the upper cap and flash in area.The unloading mechanical arm moves into the cEPTTr of the mould to take away the workpiecce to the center conveyor, then transfer to gap punching EPTT. The internal/outer blade makes use of higher put on-resistant substantial toughness die steel substance, EPTT doing work daily life, it can reuse soon after processing by the area grinding EPTT,The internal/outer blade hole is 0mm, the distance amongst the slicing into outer blade and internal blade is .2mm.
two established tools has independent EPT station No.one and No.four, vane pump, 11KW. Every single EPT station feeding the oil to two sets oil cylinders of the equipment, is EPT sliEPTTlifting and outer blade feeding reset, the EPTT functioning strain set benefit: outer blade 9 MPa, sliEPTT(go over): 9MPa.
B. EPTT gap punching EPTT
This EPTT is employed for upper cap gap punching.
The EPTT utilizes 4 column EPT presser composition, PLC management, loading/unloading by mechanical arm, the mechanical arm will stop after pushing the workpiece into the help pallet, the sliEPTTfalling down is EPTn by the best oil cylinder, the cap EPTTrs into the decrease mould, the higher mould ongoing shifting down to complete the gap punching, the scrap EPT into the aggregate box via the decrease mould cEPTTr gap. The upper mould and sliEPTTdelay reset, rise the higher cap in place, the unloading mechanical arm EPTTrs into the mould cEPTTr to get rid of the workpiece to the center conveyor, then transfer to the socket welding and poEPTTng EPTT.
Equips with No.5 EPT station, 1 set, plunger pump. Setting stress is 16MPa
C. Socket welding amp poEPTTng EPTT
This EPTT is used for upper cap socket welding and edge welding element poEPTTng. Equip with Panasonic YD-350GL4 welEPTT1 established, drinking water cooling welding torch 1 pcs, 8L automatic cycle water cooling tank one set. The main shaft motor is .75KW. PoEPTTng motor is 1.5KW, equip with the grating stability safety.
The EPTT employs 4 column EPT presser composition, loading/unloading by mechanical arm, front is socket welding, powering is inner poEPTTng, the cEPTTr mould rotation EPTs by the motor, modify velocity by EPT transducer. Place the socket in the upper cap cEPTTr gap by manual, the top oil cylinEPTTEPTs the sliEPTTmoving down, clamp the workpiece, find and push at one particular time. Following commencing the automated working plan, the mould workpiee rotates, the welding torch feeds in, and automated arc welding. At the identical time, the driving interior poEPTTng dish moves to outdoors, poEPTTng the upper cap edge welding portion. The welding and poEPTTng finish at the very same time. After then, the oil cylinEPTTreset, workpiece rises in location, the unloading mechanical arm EPTTrs into the mould cEPTTr to eliminate the workpiece, and transfer to the take care of welding EPTT via center conveyor.
Equip with NO. 6 EPT station, one established, vane pump, five.5KW. Placing stress: falling four MPa, rising nine MPa.
D. EPTT take care of welding EPTT, one set
This EPTT is employed for higher cap hadnle welding. Equip with a few sets welding torch, three EPTs complete at one particular time. Equip with Panasonic YD-350GL4 EPTs 3 sets, welding torch three pieces. Primary shaft motor is .4KW, with the grating stability security.
The EPTT makes use of 4 column EPT presser construction, PLC control, loading/unloading by mechanical arm, motor EPTs the workpiece rotation. Manually place the handle in the higher mould cEPTTr situation which is fastened by the magnet, the loading mechanical arm give up after delivery the upper cap to the mould cEPTTr situation, the oil cylinEPTTfalling EPTs the higher mould and take care of press the higher cap in placement, the computerized doing work program begins, the cEPTTr mould workpiece rotates, 3 welding torch feeding in at the same time, computerized arc welding. Following end, the oil cylinEPTTresets, and workpiece rises in spot, the unloading mechanical arm EPTTrs into the mould cEPTTr to clamp the upper cap and put on the center conveyor, then transfer to the assembly amp spot welding EPTT.
Equip with No.7 EPT station, vane pump, five.5KW. Placing stress: urgent 4MPa, growing 9MPa.
E. EPTT joggling EPTT
The EPTT is utilized for decrease cap trimming, joggling and outer poEPTTng. Primary shaft five,5KW, poEPTTng motor 1.5KW.
The EPTT uses 4 column EPT presser composition, PLC management, loading/unloading by mechanical arm, motor EPTs the cEPTTr mould rotation, the top oil cylinEPTTEPT the deflectable upper presser clamp the workpiece, the EPT method EPTs the outer blade feeding in, and do reduced cap rotating and joggling. Fter joggling, the outer blade reset, and major oil cylinEPTTEPTs the sliEPTTreset, the help pallet rises the lower cap in spot. The unloading mechanical arm EPTTrs into the mould cEPTTr to eliminate the workpiece to the middle conveyor, then transfer to the bottom foundation welding EPTT. The inner/outer blade employs higher put on-resistant large toughness die metal content, EPTT doing work life.
Equip with No.two EPT station, vane pump, five.5KW. Driving the sliEPTTlifting and outer blade feeding and reset. The environment pressure: doing work force 9MPa, outer blade 9MPa, sliEPTT(protect) 9MPa.
F. EPTT bottom base welding EPTT
This EPTT is utilised for reduce cap bottom foundation welding, equip with three welding torch, 6 EPTs could be completed at two occasions. Equip with Panasonic YD-350GL4 welEPTT3 sets, welding torch three piece. Main shaft motor .4KW, with the grating stability protection.
The EPTT utilizes 4 column EPT presser composition, PLC manage, loading/unloading by mechanical arm, motor EPTs the workpiece rotation. Manually place the bottom base in the upper mould cEPTTr position which is fixed by the magnet. The loading mechanical arm quits right after sending the upper cap to the mould cEPTTr place. The oil cylinEPTTfalls down EPTs the higher mould and bottom foundation to push the higher cap in placement, the automatic functioning software begin, the cEPTTr mould workpiece rotates, 3 welding torch feeding in at the very same time, automatic arc welding. Right after welding, the oil cylinEPTTreset, the workpiece rises in area, the unloading mechanical arm EPTTrs into the mould cEPTTr to clamp the upper cap and set on the center conveyor.
Equip with No.three EPT station, vane pump, 5.5KW, placing strain: urgent 4MPa, rising 10MPa.
G. Assembly and place welding EPTT
The EPTT is used for assembling the upper cap and reduced cap, vertical type. Air cylinEPTTpress match equips with push head link rod, employed for equally 9kg and 14kg, change the connection rod to change. Manually place the reduced cap on the platform, beside the position, set the handle opener of the upper cap reverse to the base foundation welEPTTjoint, then assembly the higher cap into the reduce cap jogging portion, open up the handbook control air valve, the previously mentioned cylinEPTTpush the press head on the socket, computerized push the upper and reduced cap. Check the lap joint, if needed, use the picket hammer to click on the lap joint to make it more nearer, Soon after assembling, handbook spot welding, about two~3 EPTs for one particular circle. After welding, manually thrust the cylinEPTTto the loading conveyor, the manage is in entrance and base foundation is in powering, the assembly and spot welding EPTT equips with SuperTIG-315 handbook arc welEPTT1 established.
H. EPTT circumferential welding EPTT
The EPTT is employed for circumferential welding of higher and reduced cap, equip with welEPTTvision monitoring program, finish the circumferential welding automatically, total automatic and no operator, each and every set equips with Panasonic YD-500GS substantial velocity welEPTT1 set, drinking water cooling welding torch one piece, 8L circle cooling tank 1 piece. Equip with welEPTTvision tracking method one established. The EPT control program utilizes EPT PLC handle unit, professional-encounter colour contact EPT procedure EPT.
The EPTT uses horizontal double shafts composition, the principal shaft and the base shaft is the identical, air cylinEPTTEPTs the feeding, reverse moving clamp is making use of for clamping or loosing the workpie. The primary shaft EPTs by the speed EPEPT, alter speed by the EPT transducer, the primary shaft motor EPTT is .75KW. The main shaft and base shaft have independent welding mould, the welding torch situation can be adjusted aEPTT the cylinEPTTaxes route, there has wonderful tuning in the welding torch, precision fantastic tuning the welding torch situation. The EPTT head has welEPTTvision monitoring technique, X/Y shaft two dimension monitoring EPTs the welding torch, X-shaft stepping motor 6N middotm, Y-shaft stepping motor 12N middotm. The EPTT head has exhaust pipe utilized for concentrating and exhaust the smoke. Equip with magnet mechanical arm gadget, a few working position loading/unloading system, loading/unloading conveyor, unloading raceway.
Note: one.) The arc placement of circumferential welding ought to in the exact same line with bottom foundation welEPTTjoint two.) Ahead of turn off the circumferential welding EPTT, must switch off the vision tracker initial, then flip off the circumferential products EPTT.
III. EPT running in customers’ EPTT
IV. Benefit
A. Lowering labour EPT – Our EPTTs can run a lot more than 15 many years, only 1 individual for having treatment of 6 sets of circumferential welding EPTTs.
B. Reducing electrical energy – welding velocity is only 60 seconds for 1 circle
C. Decreasing welding wires – (only one particular circle welding is required).
D. EPTTer operation life
E. Much less spatter – We paid about two million for Patent of YD-500GS Panasonic welding EPTTs
V. Customer reference list
1 .TK Group in Bangladesh
two. HangEPT XiHu (West EPT) Dis.hu (West EPT) Dis. EPTshan Steel CylinEPTTEPTT,Ltd.http://, it is 3rd biggest LPG gas cylinEPTTmanufacturer in EPTT, every day output is 18000pcs incXiHu (West EPT) Dis.Hu (West EPT) Dis. all dimensions from 2kgs to 50kgs.
three. TPA is production incredibly large good quality LPG cylinders for North The us, European,Uk and Australia. http://, we equipped automated welding line for their EPTT EPTT in HangEPT. Now we are constructing new LPG fuel cylinEPTTfactory in Vietnam, Hangphone, at the stop of EPTTst , 2017, it will be set up and commissed.
four: ZheJiang EPTTnri Group co.,Ltd., http://en.huanrigroup.cn/products_listing/pmcId=24.html, they are largest and strongest cylinEPTTmanufacturer in EPTT, they bougEPTT our EPTTs both for twelve.5 and15kgs producing and 50kgs producing.
5.AYGAZ in Turkey, .tr, very last 7 days, they have previously requested the complete welding line at us after comparing with Observed welding.
six. Manchester EPTTnk from Usa
7. Sahuwala CylinEPTTin India
8. EPT LPG Minimal (SEACOM Team), they are environment up a new EPTT and we will just take liable for their twelve.5kgs and 33kgs generation line.

